NO | CUSTOMER | Project Name | Date | Description Of Work |
1. | INDEPENDENT TECHNOLOGY SDN BHD | WATER BATH HEATER #2431- ATTAP VALLEY PROJECT. #2437- PATRICIA PROJECT. #2438- AZERBAIJAN PROJECT. |
SEPT 2012 & JAN 2013 | Electrical & Instrumentation - Wiring, Cabling, Glanding & Termination works. - Junction Box & Panel Installation - SS316 & HDG Cable Tray Installation. - Transmitter, Valve Pressure Gauge, Level Gauge Installation - Tubing & Fittings Installation. - Burner Management System Engineering, Setup & Installation. |
2. | OFFSHORE INDUSTRIES SDN BHD | TAPIS ENHANCED OIL RECOVERY (EOR)-E & I INSTALLATION WORKS | FEB 2012 | ELECTRICAL & INCSTRUMENTATION WORKS - Cable Ladder, Tray & Support - Cable Laying & Termination (HT & LV ) & Inter panel wiring. - Lighting & Small Power. - Grounding. - Fire Supression System |
3. | OFFSHORE INDUSTRIES SDN BHD | FUSIBLE LOOP PANEL & ESD LOOP PANEL - GUNTONG E PROJECT. | FEB 2012 | - To supply & fabricate Fusible Plug Loop & ESD Loop Panel included Tubing & Fittings Accessories |
4. | OFFSHORE INDUSTRIES SDN BHD | - FIRE SUPRESSION SYSTEM | FEB 2012 | INSTALLATION FIRE SUPRESSION SYSTEM - To install 1 Lot Schedule 40 piping c/w Fitting & Painting - To Install FM 200 Cylinder - To Install Nozzle - To Pressure Test Pipe Network - To Flush, blow or purge the pipe network |
5. | CETCO OILFIELD SERVICES (M) SDN BHD | PRODUCED WATER HYDROCYCLONE SKID – OFON PHASE 2 | MAC 2012 | Electrical & Instrumentation - Wiring, Cabling, Glanding & Termination works. - Junction Box & Panel Installation - SS316 & HDG Cable Tray Installation. - Transmitter, Valve Pressure Gauge, Level gauge Installation - Tubing & Fittings Installation |
6. | STEELCON HEAT TRANSFER EQUIPMENT | JODBER FPSO ( TOPSIDES ) PROJECT | APRIL 2013 | Electrical & Instrumentation - Wiring, Cabling, Glanding & Termination works. - Supply & Installation Junction Box & Panel. - Supply & Installation SS316 & HDG Cable Tray. - Transmitter, Valve , Pressure Gauge, Level gauge Installation -Tubing & Fittings Installation |
7. | INDEPENDENT TECHNOLOGY SDN BHD | EPCC – ONSHORE GAS LEKAS PACKAGE 3 | SEPT 2011 | Electrical & Instrumentation - Wiring, Cabling & Termination works. - Junction Box & Panel Installation - SS316 & HDG Cable Tray Installation. - Transmitter, Valve, Pressure Gauge, Level gauge Installation - Tubing & Fittings Installation. - DB, UPS Lighting, Small Power, Flood Light & Pole Installation. - VSAT & SCADA System Engineering, Setup & Installation. - Lightning Protection System Installation. |
8. | CETCO OILFIELD SERVICES (M) S/B | PT MEINDO ELANG INDAH0-RUBY FIELD DEV-P | MAC 2012 | Electrical & Instrumentation - Wiring, Cabling & Termination works. - Junction Box & Panel Installation - SS316 & HDG Cable Tray Installation. - Transmitter, Valve Pressure Gauge, Level gauge Installation - Tubing & Fittings Installation |
9. | PC INSTALLATION & CONTRACTING SDN BHD | LINDE GAS WEST PORT MALAYSIA – FEED COMPRESSION. 12. Boiler Feed Water Pumps. 13. Burner Management. 14. Vent Header. 15. Analyzers. 16. Levels. 17. Utility Tie – Ins . 18. H2 Pressure Reducing Station. 19. Feed Compressor. |
MAC 2013 | Electrical & Instrumentation . - Wiring, Cabling & Termination works. - Junction Box & Panel Installation - SS 316 & HDG Cable Tray Installation. - Transmitter, Valve, Pressure Gauge, Level gauge Installation - Tubing & Fittings Installation |
10. | OFFSHORE INDUSTRIES SDN BHD | DISTRIBUTION BOARD & INTERPOSING RELAY PANEL - KINABALU KNP –B PROJECT. - AMPA 9 - MLNG 2 DEBOTTLENECKING |
AUG 2012 MAC 2012 FEB 2009 |
WORK IN ACTION - Supply DISTRIBUTION BOARD - CIT TEST - Ammeter Test (Factory Accuracy Test without witness) |